Eldridge, ND - Kalama, WA grain loads grind up Bozeman Pass on MRL's 2nd Sub at a crawl... probably less than 10mph!
Livingston Helper #2 shoves hard on the tailend of Kalama bound grain loads, but are already down to a crawl, minutes after leaving Livingston.
Livingston Helper #2 begins to shove on the tailend of a loaded BNSF grain train and will assist them over Bozeman Pass.
MRL's Livingston helper #2 gives everything they've got to get a heavy, loaded grain train over Bozeman Pass.
BNSF SD70MAC 8852 leads a Kalama bound grain load west on MRL's 2nd Sub, cruising along the shores of the Yellowstone River.
A loaded BNSF grain train battles a stiff wind, westbound on MRL's Second Subdivision. The "Crazy Mountains" look on in the distance.
A BNSF C44-9W and a trio of MRL helpers ease off as they reach the top of Bozeman Pass on the tailend of a loaded grain train.
MRL's Livingston Helper #2 prepares to cut off from BNSF Train G ELRKAL9 11 at the top of the hill at Muir.
Eldridge-Kalama grain loads head into the yard at Livingston to get helpers added onto the rear.
Livingston Helper #2 gives everything they've got to get a loaded grain train over Bozeman Pass.
MRL's K LIVHPL2 13 (Livingston Helper #2) has just tied onto the rear of BNSF G ELRKAL9 11 and is ready to assist in the tackling of Bozeman Pass.
A loaded BNSF grain train is about to knock down the signal at the east end of Livingston on MRL's 2nd Sub. They'll get an MRL helper set attached to the rear before tackling Bozeman Pass.
BNSF SD70MAC 8852 hustles a loaded BNSF grain train westward towards Livingston, MT at Mile 99 on MRL's 2nd Sub.